Online Services | Commonwealth Sites | Help | Governor





In this Section
Stay Informed
Stay Informed
Sign up today to receive e-mail
updates about the Virginia
HOT Lanes project.

Sign Up Today

Construction Info

Construction Phases/Sections


I-495 Virginia HOT Lanes Project Area
Construction of the I-495 Virginia HOT Lanes is divided into four construction areas:

view details Beltway North of I-66 Interchange/
Tysons Corner/Mclean


For construction details on a specific interchange or overpass in this area, please click on one of the links below:

Lewinsville Road
Dulles Toll Road
Jones Branch Drive
Westpark Drive and Route 123 (Chain Bridge Road) (fact sheet) (presentation)
Route 7 (Leesburg Pike) (fact sheet) (presentation)

view details I-66 Interchange/Merrifield


For construction details on a specific interchange or overpass in this area, please click on one of the links below:

Oak Street and Idylwood Road (fact sheet)
W&OD Trail Pedestrian Bridge
I-66
US 29 (Lee Highway) (fact sheet) (presentation)

Beltway North of I-66 I-66 Interchange Beltway South of I-66 Springfield Interchange
view details Beltway South of I-66 Interchange



view details Springfield Interchange


Construction in this area includes the continuation of the Springfield Interchange Improvement Project. Improvements to the Springfield Interchange will provide a seamless integration with HOV service on I-95/395 and the Capital Beltway once HOT lanes construction is complete.


General HOT Lanes Schedule

2007 - 2009
Design and Engineering

2008
Aerial Study

Spring 2008
Design Public Hearing

2008 - 2010
Right of Way Activity

2008 - 2009
Cleaning and Grubbing

2008 - 2010
Utility Relocation

2008 - 2011
Soundwall Relocation / Construction

2008 - 2012
Bridge Construction