
Construction of the I-495 Virginia HOT Lanes is divided into four construction areas:
view details
Beltway North of I-66 Interchange/
Tysons Corner/Mclean
Tysons Corner/Mclean
For construction details on a specific interchange or overpass in this area, please click on one of the links below:
Lewinsville Road
Dulles Toll Road
Jones Branch Drive
Westpark Drive and Route 123 (Chain Bridge Road) (fact sheet) (presentation)
Route 7 (Leesburg Pike) (fact sheet) (presentation)
Lewinsville Road
Dulles Toll Road
Jones Branch Drive
Westpark Drive and Route 123 (Chain Bridge Road) (fact sheet) (presentation)
Route 7 (Leesburg Pike) (fact sheet) (presentation)
view details
I-66 Interchange/Merrifield
For construction details on a specific interchange or overpass in this area, please click on one of the links below:
Oak Street and Idylwood Road (fact sheet)
W&OD Trail Pedestrian Bridge
I-66
US 29 (Lee Highway) (fact sheet) (presentation)
Oak Street and Idylwood Road (fact sheet)
W&OD Trail Pedestrian Bridge
I-66
US 29 (Lee Highway) (fact sheet) (presentation)
view details
Beltway South of I-66 Interchange
For construction details on a specific interchange or overpass in this area, please click on one of the links below:
Route 50 (Arlington Boulevard) (fact sheet) (presentation)
Gallows Road (fact sheet) (presentation)
Route 236 (Little River Turnpike) (fact sheet) (presentation)
Pedestrian Bridge to Wakefield Park
Route 620 (Braddock Road) (fact sheet) (presentation)
Route 50 (Arlington Boulevard) (fact sheet) (presentation)
Gallows Road (fact sheet) (presentation)
Route 236 (Little River Turnpike) (fact sheet) (presentation)
Pedestrian Bridge to Wakefield Park
Route 620 (Braddock Road) (fact sheet) (presentation)
view details
Springfield Interchange
Construction in this area includes the continuation of the Springfield Interchange Improvement Project. Improvements to the Springfield Interchange will provide a seamless integration with HOV service on I-95/395 and the Capital Beltway once HOT lanes construction is complete.
|
2007 - 2009
Design and Engineering
2008
Aerial Study
Spring 2008
Design Public Hearing
2008 - 2010
Right of Way Activity
|
2008 - 2009
Cleaning and Grubbing
2008 - 2010
Utility Relocation
2008 - 2011
Soundwall Relocation / Construction
2008 - 2012
Bridge Construction
|
